| Building category: | Office |
| Project size: | 1000m2 |
| Environmental performance: | ca 120 tonnes of CO2 equivalents stored in the building structure. ZEB-COM standard. Heating by burning wood pellets. Use of non-toxic materials throughout the whole construction. Hybrid ventilation. |
| Material use: | CLT and Glulam. Wood fiber insulation. Untreated pine cladding. Low-carbon concrete. |
| Delivery from Oslotre: | Timberdesign |
| Year: | 2015 |
| Location: | Evenstad |